Turner & Townsend

Design Project Lead – Data Center Construction

San Francisco, California, United States · Remote (restrictions not stated) · Full-time

Apply on the employer’s site ↗See how well you match this job

You apply directly with the employer. ROLIVA does not submit applications from this page and is not the employer.

About the role

Description from the employer’s posting. Check the employer’s page for the current version.

  • EmployerTurner & Townsend
  • LocationSan Francisco, California, United States
  • Work styleRemote (restrictions not stated)
  • Employment typeFull-time
  • Employer posted

Turner & Townsend is seeking an experienced Design Project Lead to join our team. As an integral part of the Design Development and Delivery Team, this role will operate as the Design Project Lead overseeing the design and construction administration as an Owner’s Representative, and lead the Civil, Structural, Landscape, Architecture (CSLA) disciplines as a subject matter expert.

The Design Project Lead will collaborate with multiple stakeholders including cross-discipline partners across the Design Engineering organization, internal partners such as Planning and Development, Construction Management, Quality, Safety, and Operations as well as external partners including engineers of record (EoR), general contractors, and regulatory agencies to deliver data center capacity safely, on time, within budget, and of high quality. This position is full-time providing directional guidance aligned with the pace of fast-tracked design and construction.

Show full description

Job Description:

  • Provides support and reports to the assigned Project Manager(s) or Project Director.  Position has frequent interaction with the Owner/Client, consultants, design professionals and contractors.
  • Directly assist the Project Manager(s) in managing, coordinating and administering the project through all phases of design and construction.
  • Responsible for ensuring all aspects of client services are delivered at the highest level to ensure the client’s needs are addressed.
  • Aids in the preparation of documents (reports, schedules, invoices, RFI’s, submittals, meeting minutes/agendas, daily reports, change orders, inspections, closeout and client presentations) for programming, design and construction and will assist in maintaining information in project management software.
  • Coordinate to schedule meetings with the project team as directed by the Project Manager(s).
  • Communicate conceptual designs and create/maintain project documentation before, during, and after construction.
  • Maintenance of Basis of Design, prototype design, and template specifications for architectural elements.
  • Review and inform design RFPs.
  • Manage our external design consultants through the design and construction process.
  • Effectively communicate design standards to internal and external project partners.
  • Manage multiple fast paced projects simultaneously.
  • Think outside of the box to find innovative solutions prior to and during the construction process to reduce costs without negative impacts on quality or reliability.
  • SOX control responsibilities may be part of this role, which are to be adhered to where applicable.
  • College Degree in Business Administration, Construction Management, Engineering, Architecture.
  • 8+ years’ experience in mission critical building design, construction and or operations.
  • Experience and working in Project Management on large-scale construction programs.
  • Experienced in Design/Architecture/Civil works.
  • Solid working proficiency with AutoCAD, Revit, Bluebeam, and MS Office Suite.
  • Excellent presentation skills and the ability to be highly effective in a client-facing role.
  • Team player; ability to work collaboratively.

The salary range for this full-time role is $160K-$190K per year. Ranges are determined by role and level and represent a good faith effort to provide a fair and equitable salary. This range is a reflection of base salary only, not of a total compensation package.  Please note Turner & Townsend reserves the right to pay more or less than the posted range, depending on candidate’s experience and qualifications.

*On-site presence and requirements may change depending on our client's needs.

Our inspired people share our vision and mission. We provide a great place to work, where each person has the opportunity and voice to affect change.

We want our people to succeed both in work and life. To support this we promote a healthy, productive and flexible working environment that respects work-life balance.

Turner & Townsend is an equal opportunity employer. We celebrate diversity and are committed to creating an inclusive environment for all employees and actively encourage applications from all sectors of the community.

Please find out more about us at www.turnerandtownsend.com/ and https://www.heery.com/

All your information will be kept confidential according to EEO guidelines.

Join our social media conversations for more information about Turner & Townsend and our exciting future projects:

Twitter

Instagram

LinkedIn

It is strictly against Turner & Townsend policy for candidates to pay any fee in relation to our recruitment process. No recruitment agency working with Turner & Townsend will ask candidates to pay a fee at any time.

Any unsolicited resumes/CVs submitted through our website or to Turner & Townsend personal e-mail accounts, are considered property of Turner & Townsend and are not subject to payment of agency fees. In order to be an authorised Recruitment Agency/Search Firm for Turner & Townsend, there must be a formal written agreement in place and the agency must be invited, by the Recruitment Team, to submit candidates for review.

Staying safe while you apply

  • Never pay to apply, interview or accept an offer. ROLIVA never asks you for payment to apply to a job.
  • Apply only through the official “Apply on the employer’s site” button, on the employer’s own site, and check that a recruiter’s email uses that employer’s own domain rather than a free email address.
  • Be cautious of an offer made with no real interview, or pressure to decide quickly or share financial details early.

Does something look wrong with this listing? Use “Report broken link” in the role details, or read ROLIVA’s full job-safety guidance ↗.

Preparing for this role with ROLIVA

  • Check the fit.

    Compare the requirements with the experience you have confirmed, including gaps.

  • Prepare honestly.

    Build interview stories and application drafts from your own evidence.

  • Keep track.

    Save the role and record your own application status and follow-ups.

Create a free workspace or log in.

Project manager jobs in United States

ROLIVA currently lists 900 open roles like this in United States.

Employers hiring for this

  • Capital One Financial54 open roles
  • Trane Technologies50 open roles
  • Barry-Wehmiller31 open roles
  • Turner & Townsend30 open roles
  • ERM22 open roles

Top skills asked for

Listings whose description mentions each term. A mention is not a requirement.

At a glance

  • Work styleRemote (restrictions not stated)
  • Employment typeFull-time
  • SeniorityLead / Principal
  • Employer posted
  • Added to ROLIVA
  • Last checked

Explore similar roles

Similar jobs